EnSeCo visited Indra Air Trffic Inc. in Kansas City, USA.
As part of the visit, EnSeCo representatives met with the Sakaeronavigations team, conducting Factory Acceptance Tests of ILS/DME equipment for Kutaisi. EnSeCo participates in the ILS/DME installation project for Kutaisi as an installation company at all stages of ILS/DME equipment installation and customisation.
EnSeCo also got acquainted with the production process at Indra Air Trffic Inc. 75 people are involved in the production process. The large volume of Indra Air Trffic Inc. equipment should be noted.
At the meeting with Kenneth Cleveland, vice-president of Indra Air Trffic Inc., they discussed cooperation issues in the implementation of projects.